Koror, Palau Airport
Problem: The Island community of Koror, Palau built additional runways at the airport and need additional drainage along the edge of the runway. Surangel & Sons Construction Company was the construction company that was doing the installation.
Solution: It was decided that Hydraway 2000 would be installed. Hydraway met the ridged specification and the quick shipment. Several conversations had to take place and since the island is located South of the Philippines communication was done late in the evening on behalf of the Hydraway Team.
Resolution: All 8700 linear feet shipped on time, and construction is ongoing.